Home / Hiring guides / How much does a groundworker cost in the UK?
How much does a groundworker cost in the UK in 2026?
A groundworker digs and prepares the ground before anything else is built — strip and raft foundations, concrete slabs, below-ground drainage, soakaways, excavation and driveway sub-bases. Groundwork is the first trade on site, and the hardest to price blind, because nobody knows what is under the surface until the digging starts.
Published 28 November 2026 · Direct Hire
What a groundworker charges
Published 2026 price guides agree on these ranges. Most groundworkers quote a day rate for labour, with plant hire, materials and muck-away charged on top, so always ask what the rate includes. The figures below are labour unless stated:
| Charge | Typical rate | Notes |
|---|---|---|
| Day rate, skilled groundworker | £170–£280 | Standard domestic groundwork |
| Day rate, labourer or trainee | £120–£170 | General labour on site |
| Day rate, ticketed plant operator | £200–£280 | CPCS or NPORS ticket, 360 excavator |
| Hourly rate | £18–£32 | Small jobs and call-outs only |
| Day rate, London and the South East | £220–£320 | Highest rates in the country |
| Two-person team, per day | £400–£650 | Groundworker plus labourer or operator |
| Mini-digger hire, per day | £150–£280 | Machine only, delivered to site |
| Mini-digger with operator, per day | £300–£600 | Machine, fuel and driver included |
A day rate covers labour, tools and transport; it does not include the digger, the concrete, the aggregates or taking spoil away. On a fixed-price job those extras are bundled into one lump sum, so compare like with like before you choose.
What groundwork jobs cost
Day rates suit open-ended work; most domestic groundwork is priced per job. These are typical 2026 guide prices, before VAT where the trader is registered:
| Job | Typical price | Notes |
|---|---|---|
| Strip foundations, per linear metre | £90–£150 | Trench dug, concrete poured |
| Reinforced concrete slab, per square metre | £70–£120 | Mesh, concrete and finishing |
| Drainage pipe, per metre | £60–£120 | Below-ground pipe, laid and connected |
| Driveway sub-base, per square metre | £30–£60 | Excavated, hardcore and compacted |
| Foundations for a small extension | £3,000–£8,000 | Depends on depth and ground conditions |
Ground conditions move the price most: clay, rock, old rubble or a high water table can add days and extra plant. Get the scope in writing and ask what happens if the ground turns out worse than expected.
What changes the price
- Ground conditions. Clay, rock, old rubble or a high water table can add days, extra plant and muck-away — ask how the quote handles surprises.
- Plant and access. A mini-digger, dumper and muck-away are charged on top of labour; tight access or no room for a skip adds cost.
- Day rate or fixed price. A day rate suits open-ended digging; a fixed lump sum suits a defined scope — make sure the quote says which it is.
- Design and approval. The structural engineer specifies the foundations, not the groundworker, and building regulations approval must be in place before digging starts.
Hire a groundworker directly
On Direct Hire there is no agency in the middle. You post the job and agree the price with groundworkers; our ten questions checklist covers the fixed written quote, what is included, and clearing up, and our guide to hiring a tradesperson covers the checks to make before you book. Direct Hire takes an 8% commission on completed jobs (£40 on a £500 job), paid by the provider, never added to your price. Browse the live services, read our groundworker FAQ, or use our free cost-of-hiring calculator.